Grants Xebec 1:60 (using Jabeque Cazador Occre1:60 kit) [COMPLETED BUILD]

Good morning
A little off the topic…I took my staff away for 2 days for our year end function….I cannot believe it is that time of the year again…

A little outdoor team building:
08A4CAFA-5B4D-4170-80B9-1194FC222E4A.jpeg
That old guy ….even on our Xmas/year end party I’m still telling the guys what to do ROTF
Hike and swim at the waterfall
D34D6CA1-89BF-42D2-8F00-5405037CC5AA.jpeg
A “marriage “ of reconciliation for the two guys who give each other a hard time all year

E6803411-C928-45C0-A23C-BE1CE6AC8E5C.jpeg
My business partner and I in the “Photo Booth”. The lady who makes this business happen.
859B243E-B73E-44BC-BC3C-1812E4F371C9.jpeg
A party
65E1E4D1-ED07-4055-8C56-64080A517578.jpeg
Time is so fleeting guys embrace each moment…..

Cheers Grant
 
Good morning
A little off the topic…I took my staff away for 2 days for our year end function….I cannot believe it is that time of the year again…

A little outdoor team building:
View attachment 408749
That old guy ….even on our Xmas/year end party I’m still telling the guys what to do ROTF
Hike and swim at the waterfall
View attachment 408750
A “marriage “ of reconciliation for the two guys who give each other a hard time all year

View attachment 408752
My business partner and I in the “Photo Booth”. The lady who makes this business happen.
View attachment 408755
A party
View attachment 408753
Time is so fleeting guys embrace each moment…..

Cheers Grant
What a great and lovely event, Grant. For sure Team-Building with capitals.
Thanks for sharing!
Regards, Peter
 
Ok enough off the topic - back to Grants Xebec: this morning I could fit the bell tower, pumps and main deck cleat I had previously made. The mast is dry fitted as I like to rig as much as possible off the ship. I did add the cleats for the running rigging to mast - 4 of them.
View attachment 408757View attachment 408758View attachment 408756View attachment 408759
Cheers Grant
The deck is coming more and more alive, Grant. You will certainly be happy that the cannons are literally and figuratively set aside and you can continue with the construction.
Regards, Peter
 
Ok enough off the topic - back to Grants Xebec: this morning I could fit the bell tower, pumps and main deck cleat I had previously made. The mast is dry fitted as I like to rig as much as possible off the ship. I did add the cleats for the running rigging to mast - 4 of them.
View attachment 408757View attachment 408758View attachment 408756View attachment 408759
Cheers Grant
Hi Grant, For your Xebec to look so good under the scrutiny of those close up shots highlights the quality of your work
 
The deck is coming more and more alive, Grant. You will certainly be happy that the cannons are literally and figuratively set aside and you can continue with the construction.
Regards, Peter
Good morning Peter. That is a true story. I still have a few quoin to do however it is really satisfying to work on some deck fittings. Cheers Grant
 
Hi Grant, For your Xebec to look so good under the scrutiny of those close up shots highlights the quality of your work
Good morning Ken. Thank you. I have had a roller coaster ride with my Xebec trying to get things looking good, in the style I want however I am very happy how she is starting to come together. Cheers Grant
 
Two things I do not see here - fuzzy wood and fuzzy rope! I have to keep reminding myself this is an Occre kit! Stunning work my friend First Place Metal
Good morning Bill. Thank you. Ahh, I did cheat a bit ;) - I have some good cotton ropes and blocks which replaced the kit ones. Most of OcCre laminates I remade with left over walnut from my Victory. Cheers Grant
 
I don't see anything to improve. Love the pumps and the bell tower. Only thing you need to change is the position where the anchor cable goes through the grating. I would use the first opening and not the second opening of the grating.
 
I don't see anything to improve. Love the pumps and the bell tower. Only thing you need to change is the position where the anchor cable goes through the grating. I would use the first opening and not the second opening of the grating.
Good afternoon Peter. Thank you - coming from you it means loads. I will do that when I finish the anchors. Thanks for pointing this out to me. Cheers Grant
 
Good afternoon. Ricochet Rabbit at it again.
Ships boat continues :
Added the rails. These are from the kit however you will notice a join towards the stern as my boat design is different to the kit.
Added rubbing strakes - painted green.
2BCB7385-98FC-4296-81BD-1B0E863F4043.jpeg
1B3AECA4-2EB6-4772-8B24-C2D3320C887C.jpeg
For some fun added a ring and bar for the tackle for the sail.
F8B7AD0C-D9B0-4A33-9AE9-4E715216A643.jpeg
Cheers Grant
 