Next is more doors .
Working on the second bulkhead and the PS and SB cabins.
First I dry fit the bulkheads, some alterations are neede to get a proper fit.
For the doors in the cabins and the bulkhead I make proper door frames.
Aswell as the door frames also the doors get a rebate to properly close. On top the kit provided door.
Dry fitting the door.
Hinges are made and fitted.
And the doors hanged into their hinges.
Again dry fitting to see if the doors properly open and close.
The bulkhead and cabin walls are fitted together.
I have burned in the nail heads.
The PS cabin gets a light blue color based on the color scheme of hms victory.
See below HMS Victory
Work on the cabin to be finished hopefully this Sunday.
Working on the second bulkhead and the PS and SB cabins.
First I dry fit the bulkheads, some alterations are neede to get a proper fit.
For the doors in the cabins and the bulkhead I make proper door frames.
Aswell as the door frames also the doors get a rebate to properly close. On top the kit provided door.
Dry fitting the door.
Hinges are made and fitted.
And the doors hanged into their hinges.
Again dry fitting to see if the doors properly open and close.
The bulkhead and cabin walls are fitted together.
I have burned in the nail heads.
The PS cabin gets a light blue color based on the color scheme of hms victory.
See below HMS Victory
Work on the cabin to be finished hopefully this Sunday.