Wow, it’s Sunday and I‘ve got some shipyardtime.
I‘ve had to do with popping in out of the Forum for most of the week. There hasn’t been much shipyard time. Our time has been spent venturing into the COVID world purchasing and then mailing Christmas items, two days were needed to clear out over 20 plus inches of snow from the driveway and the dog runs.
So this morning we managed to finish the bulwark rails.
I also used my deck template to spot and drill all the holes for the eye pins, the locations for the pumps and belaying pin racks.
Jan
I‘ve had to do with popping in out of the Forum for most of the week. There hasn’t been much shipyard time. Our time has been spent venturing into the COVID world purchasing and then mailing Christmas items, two days were needed to clear out over 20 plus inches of snow from the driveway and the dog runs.
So this morning we managed to finish the bulwark rails.
I also used my deck template to spot and drill all the holes for the eye pins, the locations for the pumps and belaying pin racks.
Jan