**VIEW THREAD HERE** |
Amazing detail and workmanship. I'll be at this stage many months from now, but looking at your build has been a guide and an inspiration. Bravo !In order to finialy fix the oven the oven has to be tied up by the eight ring bolts with the inner planking.
It was not easy to handle, but somehow I was able.
Keep this in mind, when you come to this working step...... install the oven first, before you glue any beam or carlings at this area
This is the final result
View attachment 233879
View attachment 233880
View attachment 233881
Now, after fixing the blackened brass roof the oven is finalized
View attachment 233882
Some fire-wood next to the Oven - fixed between the ropes
View attachment 233885
the overview of the interior at this stage of construction - Note: the barrels etc. are only dry fitted in order to find out the final arrangement
View attachment 233883