Trumpeter 1/200 Bismarck Build [COMPLETED BUILD]

Next to be done was the airbrushing of the white and black stripes up the forward superstructure, the funnel, and the rear superstructure. This pic shows the masking of all the pieces so that the white stripe can be applied.H001@96sos.JPG
 
That is just awesome watching this come together. Great job Jim !!!

Donnie
 
Application of the Photo-etched pieces on the superstructures was the next step. The next three pics show the application on the first level of the forward and aft superstructures. This pic is of the first level of the forward superstructure. The porthole covers, doors, and some of the guns have been installed. Note also the railings. These are supplied in 0.2mm sheets of brass photo-etched parts. Every one of the railings had to be bent and rounded to conform to the profile of the piece they are to be mounted on
.302@96sos.jpg
 
Last edited by a moderator:
This pic of the midship first level shows more detail of the PE application. Note the catapults in the middle for the seaplanes to be added later.303@96sos.jpg
 
Back
Top