We ar

We are used to seeing quality work from you Peter!Macro shots have advantages and disadvantages. You see everything.
So I wasn't completely satisfied with what I saw now (even better). Adjusted a few things.
View attachment 240035
The bearing beam #102 runs against frames 1 to 27.
Not all 27 notches will be exactly aligned in a row. Therefore 5 temporary deck beams placed over an equal distance. With the advantage that I can press the beam against it when gluing in to get into place. Because only visually will not work;
All the holes for the nails marked and pre-drilled. Like the keelson, this is a beam that should give strength to the construction. So also with each frame 2 nails, both one in the front and the rear frame part.
View attachment 240036
The connection at the front to the keelson was not neat (enough). So a little extra sanding.
View attachment 240037
Looking a bit ahead at the connection of both beams to the middle deck. Made a small chamfer between the connecting parts because the space between the lower (#102) and upper (#103) beam was just not the thickness of a beam. It's not much, but enough to not fit correct.
Regards, Peter



ing on it planted the idea to back up, using acetate to loosen the crane assembly and then pull it out leaving the mast top open to receive the newly made lower shrouds.







