**VIEW THREAD HERE** |
NMBROOKI am back on this build after recent issues with my chest where I wanted to keep away from Epoxy etc whilst I recovered.
Whilst waiting for Epoxy to dry whilst plating the funnel (pictures to follow) I have done a trial of my rivet detail.
First picture shows what 3000 0.5mm brass nails from Drydock models and parts looks like.
Other pictures show what they look like installed. I am more than happy with the results. I had two big concerns, they would be too prominent and secondly they would be too sloppy in a freehand drilled 0.5mm hole. A hole is rarely the true size when the item is not fixed in a machine.
I have a plan for a Dillingers guide which I will show in a later post.
View attachment 504092View attachment 504093View attachment 504094
Hi Nigel,Plumbing,plumbing and more plumbing........
With everything placed in the hull I am in the middle of making and trial fitting all the pipework.
The first picture shows the gas Attenuator valve in position with gas feed to the burners and pressure feed from the boiler using an additional steam valve as a takeoff.
The displacement lubricators are connected to the steam feed pipe via Globe valves. These enable me to shut either engine down and run the other to help with diagnostics. This assembly is temporarily chocked up to enable me to make the steam feed manifolds for each engine at the same time ensuring the gas tank can be removed for refilling and I have enough space for the gas shut off servo.
As a side note the exposed brass of the condenser will be clad in Mahogany as the boiler
View attachment 517352View attachment 517353View attachment 517354View attachment 517355