Hi Donnie, your workmanship is great, but you have a small problem, the hanging knees LDHK-1 AND LDHK-4 are on the wrong side of LDB-2. They need to be relocated so the lodging knees LDK-2 and LDK-5 can be installed. If you get the joints wet and let them set for about 15 to 20 minutes, they will be easy to remove, you will need to reverse the locations so the bevels are not next to the beam.