Re: OcCre Santisima Trinidad Build Log
<r>Please let me say to all:<br/>
Gary, Joe, Tadeusz, Kent, carlosys, Wayne<br/>
Thank you very much for the compliments. A lot of frustration went into this - and probably the end result is some problems. But, I must move on. In the process of tidying up some lines, I managed to pull or snap completely loose and free the aft belaying pin rack as it went flying in the air back down on the other rigging. Actually had all the lines and belaying pins attached. Glued it back ! Enough of this. Time to move on.<br/>
What is next is that I do not have any Main Mast Yardarms done at all. 4 of these will have to be build along with associated rigging. I would say that for me, the most easy is to rig the running rigging onto the Yards with Sails as much as you can and let the lines hang down or curl them up or whatever to keep them in order. <br/>
Joe, here are the steps involved in the Rope hanging around the Belaying Pins. <B><s>
</s>Use Plenty of beeswax<e></e></B>. Not all beeswax is the same and some places cheat by selling you "candle wax".<br/>
EDIT: Please see the post that I made (several down) on Mon Apr 29, 2013 9:13 am about this diagram.<br/>
EDIT AGAIN
lease see this topic on relocating all the foremast Halyards. The bitts layout is NOT correct.<br/>
<URL url="http://shipsofscale.com/phpBB3/viewtopic.php?f=52&t=47&start=690"><LINK_TEXT text="http://shipsofscale.com/phpBB3/viewtopi ... &start=690">http://shipsofscale.com/phpBB3/viewtopic.php?f=52&t=47&start=690</LINK_TEXT></URL></r>