Deadeyes rigged and placed in the channels, Chris will be interested to know that there are 42. They will be tied to a length of chain which is fixed to the upper wale -
View attachment 196319
Rigging is made somewhat more difficult when you have a poodle sleeping on your knee -
View attachment 196320
In order to fix the chains I need to know the angle of the shrouds from the futtocks, so I need the lower masts in place. While I was at it I cut out all of the masts and spars -
View attachment 196321
Masts dry fitted. I can now run a line down from the futtock location (denoted by the white tape) to get the angle. Four masts on this ship, the rearmost being the 'Bonaventure' mast which is the only one to be raked.
View attachment 196322
I now need some eyelets to attach the chain to the wale, but have used most of them supplied with the kit in order to rig the cannon, walkway etc. Hopefully they will arrive tomorrow, but plenty of other things to be getting on with if not.